Our material processing follows a structured four-step approach to ensure quality and precision. It begins with material reception and verification, followed by thorough inspection. The material then undergoes controlled irradiation processing before final certification and dispatch, ensuring it meets the required standards.
1ST Process
Material arrives at our facility. It is unloaded, cross checked and kept at our facility.
2ND Process
Material details are carefully verified. The packaging is checked and plant head conducts final inspection before processing.
3RD Process
The material is loaded on the machine carefully to undergo irradiation processing, as per the required dosage.
4TH Process
The material is unloaded, labelled, certified and after corporate office clearance, is loaded back into the truck to reach its final destination – 100% irradiated.